- Isolate the cooler, close saltwater inlet and outlet, close lube oil inlet and outlet valves.
- Put blanks between valves & Shell of lube oil side.
- Open the testing flange Cover & put air connection assembly flange with a calibrated pressure gauge and a control valve.
- Slowly admit service air upto pressure 4 bar, after reaching 4 bar close the control valve.
- Keep the system pressurised for 30min. Pressure should not drop more than 10%.
- If pressure drop is more, then there is a leak & carry out leak test.
No comments